IEC 62305 · Ed. 3.0:2024

IEC 62305 lightning protection, from building model to dossier.

One building. Three studies. One document.

Risk assessment (Part 2), LPS design (Part 3) and surge protection design (Part 4) in one browser workspace. Build the model, develop the protection, and issue clause-referenced documents.

Free to run: model, calculate and inspect the working. Pay to unlock your reports and dossier.

Five connected parts. Three roof levels. Add a wing, shape a corner, then inspect the protection on the building you drew. Follow the workflow → Open the video

3 studies live today

From the protection decision to the specification

Start with the study you need. Add the others on the same building when the job calls for them.

IEC 62305-2 · Ed. 3.0:2024

Lightning Risk

What protection does this building need?

Assess each risk zone, inspect the calculation working and establish the required protection measures.

IEC 62305-3 · Ed. 3.0:2024

LPS Design

How will you develop the external protection?

Develop rod and down-conductor layouts, inspect roof coverage, and calculate separation distance and earthing requirements.

IEC 62305-4 · Ed. 3.0:2024

SPM Design

What surge protection should you specify?

Specify manufacturer-neutral SPD requirements for each service and equipment group, then check candidate-device data.

Build the model you will assess

Wings, corners and different roof levels

Assemble connected parts, draw a polygon and move its corners. Set each part’s height, position and rotation.

The shared structure feeds every study. See it in 2D and 3D, with the figures and dimensions that belong to the design.

See how to start a building →
Meridian Works in the current editor: connected wings, an angled entrance and a raised plant room at three roof levels.
One connected structure, assembled from five editable parts.
The plan of the same multi-part building, with its protection layout and stepped roof outlines.
The design follows the building’s actual outline and roof levels.

Develop the protection

Place it. Recompute it. Inspect the result.

Edit air-termination rods and down-conductor positions. Inspect roof coverage and exposed areas, alongside separation and earthing calculations. Build a surge-protection specification for the services and equipment groups inside.

Positioned external equipment can be checked against suitable rod-layout data. Installation conditions and manufacturer coordination still need the engineer’s assessment.

Know when the basis changes

The protection level from Part 2 floors the Part 3 design; both feed the Part 4 schedule. Inherited values carry their source, a weaker choice is refused, a departure is printed as a departure — and an input changed after a study computed flags that study stale.

A preview is not a new issued result. Save your changes, recompute affected studies, then issue the updated document.

Inspect the working before you pay

Read the calculation steps, assumptions and clause references on screen. Explore the full public samples, then run your own building with a free account.

Guides and validation evidence →

What you deliver

A document with a traceable history

Every study of a building composes into one clause-referenced dossier: each chapter exactly as issued, the shared basis stated once, and any disagreement surfaced rather than smoothed over.

Project and client details, the named engineer, report identity and revision history travel with the issued result. A later change creates a new revision; the earlier issued content stays frozen.

Printable documents and PDFs. One study, or the combined building dossier.

Read the full sample dossier →
A sample report title block with project details, report number and two recorded revisions; all people and project details are fictional.
A fictional example showing the report identity and revision record.
See the shared basis behind the chaptersThe sample dossier basis table: shared values, source studies and clause references.

Check the evidence. Check the fit.

Built to Ed. 3.0:2024, with calculations reconciled against published examples from Furse, DEHN, Schneider, Legrand and ITU-T. Each study explains its checks and limitations. Software checks and worked examples are distinct from an independent professional review.

Which buildings can I model?

Connected parts with flat roofs at different heights, including polygon outlines. Pitched roofs, overhangs and courtyards need a different modelling approach; this is not a full CAD or BIM workflow.

What is free?

Building modelling, study calculations and on-screen working. Pay for one study’s documents, a Building Pass or Practice access. Compare access and reissue rights.

Start with your building

Create the model, inspect the working and decide what to issue. Create a free account and run it today. Practice access is available.

Create a free account →

No spam — occasional product updates, and you can leave any time.